0
Brass
Shop All
Woodwind
Shop All
Accessories
Shop All
Hire
See All
Repair
See All
Menu
Your cart is currently empty.

Return to shop

Here's the original layout. The client was having issues getting over the top of the first branch to reach the first slide. The other issue was a stuffy low end with the 5th valve. The end result was a 90 degree rotation of the 5th valve with a new open circuit. Also the leadpipe was re-bent and made removable lifting it off the bell, to a more open position to enter the top knuckle.

The initial layout of the 5th
Fill and re bend the leadpipe
Braces all made and modifications to the 5th knuckles made, now it ready to start soldering together
All finished up and ready to go.
magnifier